Manufacturing
Turn raw materials into finished goods with recipes, production entries and work orders, so your stock and costs stay correct.
What it is
The Manufacturing module is for businesses that make their own products. You write down a recipe (also called a bill of materials, or BOM): which ingredients go into one finished item, and how much of each. When you record a production, the system takes the ingredients out of stock and adds the finished items in.
Bigger factories can also use work orders, job cards, production planning, quality checks and subcontracting.
Why you would use it
- Your stock stays right. Flour goes down when bread goes up, with no manual stock adjustments.
- You know what each item really costs to make, including wastage and extra production cost.
- You can plan ahead and see which materials you are short of before you start.
How to use it
Open Manufacturing from the left menu. A bar across the top shows the parts you have permission for: Dashboard, Recipe, Production, Work Orders, Job Cards, Production Planning, Capacity, Quality, Subcontracting, Masters, Reports, Manufacturing Report and Settings.
1. Create a recipe
- Make sure the finished product and every ingredient already exist as products. See Products.
- Go to Manufacturing > Recipe and click Add.
- Under Choose Product, pick the finished product. You can also use Copy from recipe to start from an existing one.
- In Add Ingredients, pick each ingredient and enter its Input Quantity. You can add a Wastage Percent for each one.
- Optional: click Add production step to group ingredients into named steps.
- Enter the Total Output Quantity, any Extra production cost, and Recipe Instructions.
- Save. The recipe list shows the cost and unit price, worked out from your ingredient purchase costs.
2. Record a production
- Go to Manufacturing > Production and click Add.
- Choose the business location and the product. The ingredients from the recipe fill in by themselves.
- Check the quantity, the Manufacturing Date and the Wasted Quantity. Leave the reference number blank to get one made for you.
- Tick Finalize when the batch is really finished. Finalizing takes the ingredients out of stock and adds the finished product. After that you cannot edit the production.
- Save.
3. Work orders (optional, for larger shops)
- Go to Manufacturing > Work Orders and click New work order. You can also start one from a sales order.
- Pick the item and Planned qty. Choose Release now (creates job cards) to start straight away.
- Use Materials check to see what is short. Then use Make stock entry to record what was made and what was used.
- Use Stop, Resume, Reschedule, Cancel work order or Close (short of planned) as needed. Print work order sheet gives the shop floor a paper copy.
Production Planning collects what you need to make (you can Import from sales orders). It works out Material requirements, then can Make work orders or Create purchase requisition for the missing items. Under Masters, you set up your Workstations, Operations, Routings, Holidays and Downtime.
Reports
Manufacturing > Reports includes: Work order summary, Work orders in progress, Job card summary, Material shortage, BOM stock / can make, BOM operations & time, Production analytics, Material consumption variance, Downtime analysis, Cost of poor quality, Quality inspection summary, Lot traceability, Production forecast and Artisan / worker payout. Manufacturing Report gives a quick total of your production.
Tips / common questions
- Settings lets you set the Production Ref No. prefix. You can also lock ingredient quantities with Disable editing ingredients quantity in production, or update the product's purchase price from the production cost when you finalize.
- If the Accounting module is on, Post manufacturing stock entries to the ledger records each production in your books.
- In the recipe list, Update product price copies the recipe's unit price into the product's purchase price.
- Moving stock between branches? See Stock transfers and adjustments.